Contact

Services

Structures

Our structures capability spans both the water and civil engineering sector.

Through our collaborative frameworks, we have delivered turnkey water retaining and load bearing structures on a variety of projects.

From a 2ml reinforced water reservoir, water treatment centre, reinforced concrete highway bridge or railway bridge, our cross industry capability offers both the water and civil engineering sectors the craftmanship and attention to detail that we are known for.

Our in house reinforced concrete and temporary works experts combined with our direct delivery workforce make sure that we use our experience and attention to detail to go the extra mile.

Our expert delivery includes:

  • The Taunton waste recycling centre upgrade work showcases our in house expertise in delivering multiple complex reinforced concrete structures as part of the programme to produce more renewable energy on the site through our major civils framework with Wessex Water.
  • Our structures capability also stretches across the entire water and civil engineering sector, covering dam spillways through to the construction of a 2ml reinforced concrete reservoir at Grimstone, Goulds Hill and Woodhill.
  • Construction and installation of the Destructor Bridge, Bath City Centre.
Aerial view of building
West Huntspill Water Recycling Centre

West Huntspill Water Recycling Centre

Envolve operate at the Strategic Partner level within the Wessex Water AMP 6 Delivery programme.

Read More
Taunton Ham WRC

Taunton Ham WRC

The Taunton Ham WRC Advanced Digestion scheme formed part of this programme and was generated by the Wessex Water output of producing more renewable energy.

Read More

Updates

The Latest from Envolve

All News
The Network Plus Envolve Joint Venture Awarded Strategic Delivery Partner Appointment on South West Water Ltd £3bn AMP8 Engineering Tier 1 Delivery Framework.

The Network Plus Envolve Joint Venture Awarded Strategic Delivery Partner Appointment on South West Water Ltd £3bn AMP8 Engineering Tier 1 Delivery Framework.

Posted: 20.11.2023

Read More
Glenboi Primary School Outdoor Learning Area

Glenboi Primary School Outdoor Learning Area

Building social value

Posted: 07.09.2023

Read More